ESSAY · 29 JUL 2022 · 5 MIN READ
Building the Data Org from scratch, and how it evolves as the startup grows
A data org is built in stages. How its goals, size and tools change from seed to maturity.
Originally published on Medium, 29 Jul 2022
I have shared the complete idea of the data org (refer to this article). However, it doesn’t directly come into existence in one go. There are multiple iterations and stages it has to go through before it reaches its final stage.
In this article, we are going to see the evolution of the data org as a startup grows and its needs change. To build the right data org, we have to set up the processes and structures early only.
Early or Seed Stage
Objective
Set up the data ecosystem and complete the data pipeline from the start. Data visibility is primarily solved by the Data Org at this stage, and using that data, Founders/Business/Product people validate their early hypotheses and iterate on the product/business.
People: Data generalists are required at this stage. 0–1 data stage. 1–2 person team.
- Data Generalist: Only 1 person is required. Understanding of Analytics, BI & Reporting, SDLC, and Tech (Front End/Back End/Mobile) Architecture.
- Tech POC: Preferably 1 POC from each tech team (Front End/Back End/Mobile). If not, then 1 overall POC is enough who can help capture data and move it from A to B.
Process & Systems
- Data Quality issues should be minimized and data delivery should be under 24 hours.
- Ensure that if a founder asks a question then they are able to get an answer in real time.
- A minimalistic Data Stack should be used with minimal cost. SQL, Excel, any Database/DW, open source visualization tools, Python.
Series A/B or PMF Stage
Objective
Set up all the reporting & dashboarding, which enables the product and business teams to act in real time and removes dependency. Focus on 0–1 product and business problem solving.
People: Data Generalists & Generic Analysts are required at this stage. 0–1 product/business stage. 2–4 person team.
- Data Generalist: This person slowly starts setting up the base of the central data team, which includes passive data consumption, data pipelines, data capture, and the rest of things. Only 1 person is required.
- Generic Analysts: They are problem solvers at the core and can solve any business problem via data. They should be domain agnostic analysts. 2 or more people may be required here. This is the start of the analytics team. Resources are fungible, and projects are picked based on business impact.
- Tech POC: Preferably 1 POC from each tech team (Front End/Back End/Mobile). Someone in this team needs to have data engineering skills as well.
Process & Systems
- Data Quality issues should be minimized and data delivery should be under 24 hours.
- Ensure that if a founder asks a question then they are able to get an answer in real time.
- A minimalistic Data Stack should be used with minimal cost. SQL, Excel, any Database/DW, open source visualization tools, Python.
- The analytics team should be generating actionable insights, recommendations and RCAs, and optimizing products.
- A flat hierarchy and no org design should exist at this stage.
Series C or Growth Stage
Objective
Focus on optimizing and scaling the product/business via analytical/DS solutions. Set up an analytical framework for the business and product teams to enable them to scale the business. Incident alerting & monitoring should be set up.
People: The complete Data Org in its minimalistic form is required and should start taking form. 1–100 product/business stage. 6–10 person team.
- Central Data team: 1–2 people required. This team will completely abstract out the upstream and downstream data layers and will ensure high-quality, consumable data assets.
- Analytics Team: 4–8 people are required. Specialists will be required and will work dedicatedly with their stakeholders. Resources are still shared, however primary stakeholders are defined.
- Data Science Team: 1–2 people required. Start identifying the most impactful data products, which will give us a competitive advantage and significantly change the product experience.
- Data Engineering Team: 1–2 people required. All the pipelines need to be managed, and the data infrastructure needs to start being set up.
Process & Systems
- Data Quality issues should be minimized and data delivery should be under 24 hours.
- Ensure that if a leader asks a question then they are able to get an answer in under 24 hours.
- A minimalistic Data Stack should be used, with some cost. SQL, Excel, Cloud Database/DW, paid visualization tools, Python, self-serve analytics tools (Amplitude/Mixpanel), ELT/ETL tools. Design-first approach.
- A hierarchy and minimal org design should exist at this stage.
Post Growth Stage
Objective
Focus on scaling the data org with impactful analytical and data products in mind. Data Governance, Data Privacy & Data Security should take priority here.
People: The complete Data Org in its true form is required. 20+ person team.
- Central Data team: 4–6 required. This team will start optimizing and putting policies, structures, and processes in place for upstream data, downstream data, and any tools/individuals that use data.
- Analytics Team: 10+ people are required. Analysts will start picking up optimization and predictive analytics problems.
- Data Science Team: 4–5 people required. Core product experiences are being upgraded by data products, and data products are driving revenue for the business here.
- Data Engineering Team: 4–5 people required. Scale, optimize and reduce the cost.
Process & Systems
- Data Quality issues should be minimized and data delivery should be under 24 hours.
- Ensure that if a leader asks a question then they are able to get an answer in under 24 hours.
- A minimal Modern Data Stack should be used, with ROI attached to cost. SQL, Excel, Cloud Database/DW, paid visualization tools, Python, self-serve analytics tools (Amplitude/Mixpanel), ELT/ETL tools, open source or internal data discovery and data cataloging. Design first & build in-house approach.
- A hierarchy, proper org design, and roles should exist at this stage.
Maturity Stage
Objective
Focus on driving revenue through data products and optimizing it. Data Governance & Management is mature. Analytics is the input and Data Science is the output.
People: The complete Data Org in its true form is required. 100+ person team.
- Central Data team: 10+ required. This team will meet all government and international guidelines.
- Analytics Team: 50+ people are required. Analysts are working on advanced analytics and regularly producing work for the data science team, which becomes data products.
- Data Science Team: 20+ people required. Revenue is driven by this team.
- Data Engineering Team: 10+ people required. Scale, optimize and reduce the cost.
Process & Systems
- Data Quality issues should be minimized and data delivery should be under 24 hours.
- Ensure that if a leader asks a question then they are able to get an answer in under 24 hours.
- An in-house Data Stack should be used. Design first & build in-house approach.
- A hierarchy, advanced org design, and roles should be there.
These are my thoughts at the moment. I will keep updating this as and when.